Email this post as a PDFOperations · 22 September 2026 · 5 min read

Assembly orders versus production orders: when to use which

Business Central has two ways to make a finished item from components. Assembly is simple, fast and in the Essentials licence. Production is a full manufacturing module in Premium. Choosing wrong in either direction is expensive. What each one does, when to use it, when not to, and the pros and cons side by side.

Contents
  1. Assembly orders
  2. Production orders
  3. Side by side
  4. Use assembly when
  5. Use production when
  6. Do not use assembly when
  7. Do not use production when
  8. Can you use both?
  9. Can you move from one to the other?
  10. The decision in one question

"We make things, so we need manufacturing" is the sentence that starts a lot of over-scoped projects. Business Central has two mechanisms for turning components into a finished item. Assembly is light, quick to set up and included in the Essentials licence. Production is a full manufacturing module, needs the Premium licence for every user in the tenant, and takes a project to implement. Plenty of businesses that "make things" only need assembly. Some that think they are "just kitting" need production. Here is how to tell.

Assembly orders

An assembly order takes an assembly BOM (a flat list of components and resources, with quantities) and makes a quantity of the parent item, consuming the components and posting the output in one step. There are no operations, no routings, no work centres, no capacity, no work-in-progress. You can post an assembly order on its own (assemble to stock) or have one created automatically behind a sales order line (assemble to order), so that the kit is built when the order is shipped and never sits in stock.

Designed for: kitting, bundling, light configuration, simple packaging, anything where "making" is picking components and putting them together with no meaningful process between.

Production orders

A production order takes a production BOM (which can be multi-level, with versions, scrap and phantom items) and a routing (a sequence of operations at work centres or machine centres, with setup and run times), and tracks the make through its life: planned, firm planned, released, finished. Components are consumed by operation, output is posted by operation, work-in-progress is valued on the balance sheet, capacity is planned and loaded, subcontracted operations go out on purchase orders and come back, and the whole thing feeds MRP, which plans the production and purchase orders you need to meet demand.

Designed for: manufacturing in the ordinary sense: operations that take time on resources that have limited capacity, with work in progress, scrap, routings, subcontracting, and planning.

Side by side

AssemblyProduction
LicenceEssentialsPremium (all users)
Bill of materialsFlat assembly BOMMulti-level production BOM, versions, phantoms, scrap
Routing and operationsNone (resources can be added as a line for cost)Routings with operations, setup and run time, versions
CapacityNoneWork centres and machine centres, calendars, loading
Work in progressNone; consume and output in one postingYes; WIP valued, consumption and output by operation
SubcontractingNoYes, via subcontractor work centres and purchase orders
PlanningAssemble-to-order links to the sales line; order planningFull MRP/MPS via the planning worksheet; order planning
CostingStandard or actual; components plus resource linesStandard or actual; material, capacity, subcontract, overhead; variances
WarehousePick for assembly; assemble-to-order pick on shipmentPick for production consumption; put-away of output
Lot and serial trackingYesYes
Setup effortHours to daysWeeks to months
Who uses it day to dayWarehouse or sales adminProduction planners, shop floor, cost accountants

Use assembly when

  • The "make" is combining components with no process worth measuring: gift sets, bundles, kits, spares packs, a product plus its accessories.
  • You want to sell a configured item without stocking every combination: assemble-to-order builds it on the sales order and the components are what you hold.
  • Time on a resource is not a constraint: nobody is scheduling a machine or a shift.
  • You do not need WIP on the balance sheet.
  • You are on Essentials and want to stay there.

Use production when

  • Making takes operations in sequence, on resources with finite capacity, and you need to plan them.
  • Work sits in progress between operations and the accountant needs it valued.
  • You subcontract an operation and need to track it out and back.
  • You need scrap, yield and variance reporting by operation.
  • You need MRP to plan purchases and production from demand and forecasts.
  • You have multi-level BOMs where sub-assemblies are made, stocked and consumed, or need BOM and routing versions with effective dates.

Do not use assembly when

You are using it to avoid Premium and it is hurting. The signs: assembly BOMs nested three deep because you have "sub-assemblies"; resource lines being used to fake operations and someone keeping capacity in a spreadsheet; WIP calculated at month-end by hand; "kits" that take two days and three people to build. At that point the licence saving is costing more than the licence.

Do not use production when

You are a distributor who bundles. The signs: production orders with one operation that takes zero minutes; routings that exist only because the module requires one; a planner whose job is pressing "finish" on orders that were made as soon as they were released; and 40 Premium licences for a business where three people make kits. The implementation took months, the users resent it, and assembly would have been live in a week.

Can you use both?

Yes, and many manufacturers do: production for the manufactured items, assembly for the kits and bundles sold around them. The item's Replenishment System (Assembly or Prod. Order) decides which mechanism makes it, so the choice is per item, not per business. A common pattern is production for the sub-assemblies and assemble-to-order for the final configuration the customer chooses.

Can you move from one to the other?

Assembly to production: yes, item by item, by building the production BOM and routing and switching the replenishment system; the components and history stay. It is a project, because the routing and capacity data did not exist before. Production to assembly: easier, if you genuinely do not need the process data, but check the costing implications first because WIP and variances will disappear from the accounts.

The decision in one question

Is there anything between "components picked" and "finished item made" that you need to plan, measure or value? If no: assembly. If yes: production. If you are not sure, run the real items through the questions above with the people who make them, not the people who sell the software, and remember that the Premium decision is for every user in the tenant, so it is worth getting right; the licence post has the numbers. We are happy to look at your BOMs and tell you which side of the line you are on: get in touch.

Email this post as a PDF
A branded PDF of this post, sent to your inbox to keep, print or share. Copy in colleagues if you like.
We only use these addresses to send this PDF. Nobody is added to a mailing list. Mike at Business Boxed receives a copy. See our privacy notice.
Email this post
Talk to us
Want this done in your Business Central?
Book a 30 minute callGet the monthly newsletter